Guide 03
How long does it take to produce clothing in China?
15 to 25 days for the sample, then 25 to 45 days of production, according to a factory in Ningbo in 2026. What makes lead times longer and how to stay on schedule.
By Soup, aesomesoup ·
The short answer
Expect 15 to 25 days to make the sample, then 25 to 45 days for production. Those are the lead times a factory in Ningbo gave me face to face in October 2026, for a tracksuit and a t-shirt. On top of that, you need to add shipping to Europe, and a new sample round if the first one has to be corrected.
What makes lead times longer
- A sample you have to redo: about three more weeks for each round, which is why you want to get it right the first time.
- A detail the factory didn't understand: it finds out during production, and everything stops while it asks you the question.
- Chinese New Year: in 2027 it falls on February 6, and factories shut down around that date. So a production run that has to ship in February needs to start well before.
How to stay on schedule
- Start from your launch date and work backwards: shipping, production, sample approval, sample. Keep some margin before Chinese New Year.
- Get the production lead time written on the PI (proforma invoice) before you pay the deposit: that's what commits the factory.
- Follow up at the right pace: the day after a promised date, then after 5 working days without news on a sample, or 7 on a production run. Send one follow-up a day at most, during Chinese business hours.
